Thursday, 24 June 2010
Things are moving
A couple of days of good weather on the building site.
The polishing is well underway and looking good. Another day and a half and it will be complete until the walls are plastered. Good news is that no protection of the slab is needed. The floor is already hard and trested and very little will damage it in the normal building process.
I need to hire an explosive power tool for the frame instalation. Frames are dure Monday. Windows are due Thursday. Shed roof and other bits arrived today. I got the windows in and hope tommorrow is fair weather and I will get the roof on. It will be great to seal up the roof and the rest of the walls before monday.
I ordered the rainwater tanks and pump unit earlier in the day after looking at them yesterday. They arrived today and I have used the grinding powder from the floor as fill to make the base for the tanks beside the shed. The tanks will provide for toilets and laundry and drinking water in the house.
In all a productive day. The pest control under the frames is booked for Tusday.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment