Spent the weekend doing more wiring, finalising some timber battens and supports for plumbing fittngs and installing the ducted vacuum piping and wiring. We went to the art show on friday night and saw a great painting that might have suited the house but it is way too early to buy such things. Saturday I did all the supports for the plumbing and shower screens. This will allow for the plumber to do the rough in next week or so. Put the bath in the location and fixed the frames that support it.
Sunday was all vacuum fitting. Ran all the pipes and fittings. The AussieVac system was good,less the 600mm of pipe left over and some extra wiring that I have used for for the intercom power. Still waiting for a couple of rolls of figure 8 wiring to arrive to finish some security wiring.