Friday 3 September 2010

Roof on and a bad weekend of weather planned



The roofers fitted the rest of the roof on Tuesday and only need to do the flashing. The guttering is not the flat back half round I had been quoted so we arranged a discount arrangement rather than drill more holes and replace the guttering. The half round guttering was used and this means mounting brackets are visible where as the flat back 1/2 round has internal brackets.
We now have the rain coming down in 6 spots so I need to clad and get some downpipes on to divert the rain off the site and into the tanks and down the drain once they are full. Hole digging needed if the weather is fine.
The cladding has arrived and we can start fitting it this weekend between the predicted rain. I also have a few minor jobs to do around the doors and windows. I have paid for ceiling insulation and it should arrive saturday morning as well.

No comments: