Tuesday 23 November 2010

Plaster is here

The plaster arrived today and work will start tommorrow oon the hanging. I expect the hanging to be done by the weekend or monday then it is just let the plasterer to work on his own to do the finishing. Out by christmas ready for us to paint over the holidays.

Monday 8 November 2010

Ready for plaster

Been busy lately with insulation and wiring. Manhole spaces are ready and all the plumbing and wiring are in. Now it is wait for the plaster. We still have the eave lining, external painting, downpipes and cleaning up to do. Took one load of rubbish to the tip and have a load of scrap steel for next weekend ready to go. Must mow the grass as well this week due to the spring growth.
Planning and pricing the kitchen and laundry cupboards as well at the moment.

Tuesday 2 November 2010

Services are roughed in

The plumbers have finished roughing in, all the electrical wiring is in, the ducted vac is finished and the insulation has started going in. Plasterers are a couple of weeks away to give us a chance to ensure we have everything behind the plaster that we need. Once the plasterers start it will take about 4 weeks to finish so I will have work outside to go on with including downpipes and painting. Groundwork can be done anytime other jobs are not required.
The gas meter will end up in a better place than I thought of originally and we have wired and plumbed for a spa. Look forward to that if the money allows.